|
SPOTTER CONTROLS, INC. (972) 771-3683 A Crane Pendant Should be as Rugged as the Equipment it Operates!
|
|
SW-2
TWO SPEED SWITCH
SPEED POSITION
2 1 ____ OFF ____ 1 2
TERMINALS TERMINALS
1 X X X X 2 _______
L X X L _______
H X X H
CONTACT "L" BREAKS BEFORE "H" MAKES.
CONTACTS "1" OR "2" AND "H" ACCUMULATE.
INSTRUCTIONS:
UNITS WIRED FOR ACCUMULATING CONTACTS CONNECT FWD (UP) TO THE TERMINAL MARKED "1" CONNECT REV (DWN) TO THE TERMINAL MARKED "2" CONNECT SECOND SPEED WIRE TO TERMINAL MARKED "H"
UNITS WIRED FOR "BREAK BEFORE MAKE" CONNECT FWD (UP) TO THE TERMINAL MARKED "1" CONNECT REV (DWN) TO THE TERMINAL MARKED "2" CONNECT LOW SPEED WIRE TO TERMINAL MARKED "L" CONNECT HIGH SPEED WIRE TO TERMINAL MARKED "H"
ALWAYS CONNECT THE CONTROL COMMON TO TERMINAL MARKED "C"
IMPORTANT: NOTE THAT BUTTON CONTROLS CONTACT AT OPPOSITE END OF SWITCH. BE SURE HOIST CONNECTIONS ARE CORRECT.
ELECTRICAL RATING: 120V AC 10 AMPS.
|
This site managed by SPOTTER CONTROLS, INC.
|