SPOTTER CONTROLS, INC. 

(972) 771-3683

   A Crane Pendant Should be as Rugged as the Equipment it Operates!                                         

Home Up Contact Us About Us

 

Products
Tech Data
News
Site Map
Online Catalog

SW-2

 

TWO SPEED SWITCH

 

SPEED POSITION

 

2       1  ____ OFF ____  1        2

 

TERMINALS                                               TERMINALS

 

1         X      X                               X       X        2

_______

 

 L                X                                X                  L

_______

 

H         X                                                X        H

  

CONTACT "L" BREAKS BEFORE "H" MAKES.

 

CONTACTS "1" OR "2" AND "H" ACCUMULATE.

 

INSTRUCTIONS:

 

 UNITS WIRED FOR ACCUMULATING CONTACTS

CONNECT FWD (UP) TO THE TERMINAL MARKED "1"

CONNECT REV (DWN) TO THE TERMINAL MARKED "2"

CONNECT SECOND SPEED WIRE TO TERMINAL MARKED "H"

 

 UNITS WIRED FOR "BREAK BEFORE MAKE"

CONNECT FWD (UP) TO THE TERMINAL MARKED "1"

CONNECT REV (DWN) TO THE TERMINAL MARKED "2"

CONNECT LOW SPEED WIRE TO TERMINAL MARKED "L"

CONNECT HIGH SPEED WIRE TO TERMINAL MARKED "H"

 

ALWAYS CONNECT THE CONTROL COMMON TO TERMINAL MARKED "C"

 

IMPORTANT:  NOTE THAT BUTTON CONTROLS CONTACT AT OPPOSITE END

OF SWITCH.  BE SURE HOIST CONNECTIONS ARE CORRECT.

 

ELECTRICAL RATING:  120V AC 10 AMPS.


Built To Last!

Home ] Up ]

This site  managed by SPOTTER CONTROLS, INC.
2004 Spotter Controls, Inc. All rights reserved.
Revised: 08/05/05.